All systems shall be sized to meet the current building demand determined by the Engineer of Record. The preferred systems and reasonable acceptable alternates are listed here.
A fixture unit schedule shall be provided to show a full count of fixtures in the building and to verify overall demand for domestic cold water, hot water generation and sanitary piping going back to the city.