Top of Page
Main

6.8 Fixture Replacement and Toilet Room Modifications

All fixture replacements are to be made with fixtures approved and listed in the CPS Master Specification. Replacement of associated supports, distribution piping, headers and risers are to be done if approved by CPS after on site review of existing condition or if the existing systems need to be moved based on the new proposed restroom plan.