5.0 Electrical Projects
MEP projects will primarily focus on addressing major systems or equipment upgrades. Parameters of each project are specific to each building. Scopes are typically initiated based on known problems, and facility conditions assessments. Any equipment to be removed and reinstalled after completion of the roof scope must be tested during design and if unlikely to be functional upon re-installation must be replaced. For equipment planned to be removed and reinstalled by the GC, the GC shall also test the equipment prior to removal. Refer to section on Roofing Projects for additional information.