Coordinate the extent of work to support required scope of renovation with CPS IT and CPS OSS.
Refer to respective sections in Volume 3, Chapter 9 of these Design Guidelines.
Existing IT installations and equipment may have been third party or government funded and may need to be maintained. New IT designs should be coordinated with school to determine other planned and available equipment. Procurement of new equipment must be coordinated and direction obtained from CPS if the school, GC or CPS ITS is purchasing. Infrastructure improvements shall be performed by GC to support.