Top of Page
Main

4.4.1 Overview

Planning Rationale

As noted in 4.3, existing structures may contain hazardous building materials such as ACM, LBP, PCB-containing equipment, universal wastes, chemical containers, and other hazardous and non-hazardous materials. CPS policy is to properly identify these hazardous building materials in accordance with applicable federal, state and local rules and regulations prior to their disturbance during demolition activities.