Where the proposed school demolition project results in disturbance of the exterior landscape, parking lots, sidewalks or other surface areas, refer to 4.2 Environmental for New Construction - Site Soils and Underground Design Considerations. Special consideration should be given to the potential for USTs at the site that will require proper removal.
- Design and Construction /
- Vol. 2 Planning /
- 4.0 Environmental /
- 4.4 Environmental for Demolition
- 4.4.3 Site Soils and Underground Design Considerations